ELN negotiated a favorable
settlement of a significant opacity enforcement case in May 2006. A state
agency, acting at the encouragement of EPA, issued a Notice of Violation
(“NOV”) alleging over 3,300 opacity violations placing the client’s
operations in peril due to the potential liabilities. Settlement
negotiations lasted nearly two years, and resulted in payment of a $75,000
civil penalty along with an agreement to install particulate matter controls
at the plant and fund several supplemental environmental projects (“SEP”).
Issues that arose in the negotiation were the application of affirmative
defenses for unavoidable upsets and startups and shutdowns, interpretation
and application of opacity standards, the ability to operate the plant
pending installation of controls, and application of EPA’s Civil Penalty
Policy including ability to pay a penalty (ABLE model), economic benefit
(BEN model) and the appropriateness of proposed SEPs. The plant’s Title V
air operating permit came up for renewal during negotiations which
complicated the settlement. During the course of negotiations, the client
was also able to renegotiate its primary customer contracts resulting in
additional revenues to support the settlement.
|
 |
A client with operations in
Alaska received a renewed Title V air operation permit with two
objectionable conditions. ELN in partnership with an environmental
consultant authored an informal appeal of these conditions. The agency
director ruled in the clients favor on both issues. First, at issue was the
status of the plant as a “major” source of hazardous air pollutants (“HAP”).
The client had conducted stack testing for HAP and submitted this data to
the agency to support its calculations that it was not “major” and therefore
not subject to Boiler MACT standards. Agency staff decided to rely on
published emission factors and other methods of calculating HAP emissions
rather than the client’s direct measurements. Second, the permit included a
“compliance schedule” that included terms different than a negotiated
settlement agreement between the client and the agency.
|
 |
ELN represented a client that
received a notice of violation from a local air agency alleging
noncompliance due to a change in fuel suppliers. No physical or operational
changes occurred at the plant; rather, the plant began purchasing wood-based
fuels from suppliers that were chipping wood derived from “urban” sources
rather than traditional forest sources. Indeed, because the new fuel
included wood from construction and demolition and was dry compared to
forest fuels, and because the client already had in place procedures to make
sure the new fuel was clean and uncontaminated, it was estimated that the
new fuel resulted in a decrease in emissions. Despite these facts, the
agency expressed concerns about a potential for an increase in emissions and
started an enforcement action based on its insistence that the change in
fuels was a “modification” requiring a “Notice of Construction” (“NOC”)
application. The matter was settled by including the client’s fuel quality
assurance procedures in an enforceable order and by having the client submit
a form documenting an exemption from the NOC requirements. No fine was
levied against the client. Obtained an agency determination that emissions
during the initial construction of an oil production well were not counted
towards PSD permit applicability or against PSD avoidance limits. Because
there is typically no pipeline available, and because the initial flows are
heavy with drilling mud and other contaminants, well kick-offs require flows
into tanks resulting in emissions of VOC. ELN concluded that such emissions
need not be counted if the fully constructed source was “minor” and thus did
not require a PSD “major” permit. If the source obtains a permit that
restricts emissions to below the PSD permit thresholds, these
construction-related emissions are also not counted against the avoidance
limits in the permit. The agency ruling stating that these emissions need
not be counted for purposes of PSD applicability allowed the client to
proceed with several well drilling projects that would otherwise would have
been delayed for months.
|
 |
Obtained an agency determination
that emissions during the initial construction of an oil production well
were not counted towards PSD permit applicability or against PSD avoidance
limits. Because there is typically no pipeline available, and because the
initial flows are heavy with drilling mud and other contaminants, well
kick-offs require flows into tanks resulting in emissions of VOC. ELN
concluded that such emissions need not be counted if the fully constructed
source was “minor” and thus did not require a PSD “major” permit. If the
source obtains a permit that restricts emissions to below the PSD permit
thresholds, these construction-related emissions are also not counted
against the avoidance limits in the permit. The agency ruling stating that
these emissions need not be counted for purposes of PSD applicability
allowed the client to proceed with several well drilling projects that would
otherwise would have been delayed for months.
|
 |
On matters related to
environmental contamination and cleanup in the metal working industry, ELN
successfully represented family interests in several properties after the
deaths of the father and eldest brother. These matters were complicated by
the fact that the eldest brother with purported control over the primary
family business transferred his interests to non-family members shortly
before his death. Involved were three properties: One property (Plant 1) was
owned by a surviving brother and leased to the former family business. A
second property (Plant 2) was held by the father’s trust and leased to the
former family business. During the course of our representation, the tenant
vacated both Plant 1 and Plant 2. The father’s estate held a ground lease on
a third property (Plant 3) upon which it had constructed a building that was
presently leased to another company with ongoing operations. All three
properties evidenced significant contamination due to the release of metal
working and metal cooling fluids.
Plant 1 was straightforward in that the former family business was the only
tenant of the building since construction. The tenant was clearly obligated
under both the lease and under the Washington State Model Toxics Cleanup Act
(MTCA) to pay for remedial action costs. ELN convinced the tenant to conduct
and fund a thorough cleanup of the property (estimated at $1 million).
However the tenant refused to pay for the client’s legal and consulting fees
incurred in negotiating and overseeing the tenant’s cleanup. ELN and
litigation co-counsel sued the tenant and eventually recouped all of the
clients out of pocket expenses including the costs of litigation. The client
received a “No Further Action” (NFA) letter from the State Department of
Ecology.
Plant 2 was more complicated due to the historical use of the business by
other entities including businesses operated and then sold by the family.
However, there was evidence that the tenant contributed to the contamination
and the tenant could not attribute any of the contamination to specific
parties. The tenant cleaned up some portions of the property but refused to
address other issues. Negotiations resulted in a settlement whereby the
tenant paid for the client’s entire out-of-pocket expenses for past and
future estimated costs as well as the estimated premium for environmental
insurance. In exchange, the client released the tenant from further
liabilities.
Plant 3 presented an even more complicated scenario because three parties
were involved (Land Owner, Building Owner-Client and Occupant), and there
was a plume of chlorinated solvent contamination under the building in
addition to suspected metal working fluids under the building floor. The
Land Owner had made a claim against the father’s estate related to the
solvent plume. ELN led a review of the available evidence and concluded that
the solvent did not come from any present or historical operations at the
facility (the plume was TCE whereas only TCA had been used at the site).
Further studies by the Land Owner attempted to prove that the building was a
source, but the studies failed to conduct soil sampling in an area adjacent
to the building that was a potential source (former military motor pool).
Based on analysis performed by ELN, the client formally denied the claim
against the estate and the Land Owner failed to file suit and foreclosed its
ability to recover cleanup costs under the doctrine that a person who
acquires property through inheritance is an “innocent purchaser” and immune
from federal and state superfund liability.
At the same time, the client was demanding of the Occupant an environmental
assessment of the separate contamination under the floor when the Occupant
announced its insolvency and pending asset sale. The Occupant and the buyer
of the Occupants assets were attempting to extinguish their environmental
obligations but the deal required an assignment of the lease from the
Client. Using that leverage, ELN negotiated an agreement for cost sharing of
an environmental investigation and remediation with $500,000 contributed to
an escrow account for that purpose by the Occupant and Buyer.
|
|
|